Mega Uranium Mining & Exploration in  Canada, Cameroon, Australia, Argentina, Bolivia, Columbia and Mongolia.

2017 News Releases

2016 News Releases

2015 News Releases

2014 News Releases

2013 News Releases

2012 News Releases

2011 News Releases

2010 News Releases

2009 News Releases

2008 News Releases

2007 News Releases

2006 News Releases

2005 News Releases

2004 News Releases

2003 News Releases

2002 News Releases

2001 News Releases

Investor Resources

TSX: MGA
(15-20 min delay)

[Chart]

>> view stock information

Contact

Mega Uranium Ltd.
211 Yonge Street, Suite 502
Toronto, Ontario, Canada
M5B 1M4

Phone 416.643.7630
Fax 416.941.1090
 

Signup for email alerts

2005 News Releases

Maple Acquires Patagonia Uranium Project, Chubut Province, Argentina


May 19, 2005
  • Maple Minerals acquires Exploration Permits over 1443 km2 of ground with uranium potential in southern Argentina
     
  • Two Exploration Permits are located immediately east of the Cerro Solo uranium deposit
     
  • The ground contains numerous airborne radiometric anomalies
     
  • Programmes are planned to advance certain prospects to the drilling stage

TORONTO, ONTARIO, May 19, 2005 – Maple Minerals Corp. (“Maple”) (“MPM”: TSXV) is pleased to announce that it has acquired 16 exploration permits (“cateos”), totalling 1443 km2, over ground with uranium discovery potential in the central part of Chubut Province in southern Argentina (the “Patagonia Uranium Project”). The exploration permits cover numerous radiometric anomalies detected in airborne surveys conducted in the 1960s and late 1970s in the Mesozoic San Jorge Gulf Basin by the Commission Nacional de Energia Atomica de Argentina (CNEA: the National Atomic Energy Commission of Argentina) – see attached figures at bottom of press release.

The bulk of the radiometric anomalies detected in the CNEA surveys occur within sediments and volcaniclastics at three separate stratigraphic levels in the Cretaceous Chubut Group, respectively in the Los Adobes Formation (fluvial sandstones and conglomerates with abundant organic material), Cerro Barcino Formation (tuffs) and Puesto Manuel Arce Formation (fluvial sandstones). Additional anomalies have been detected over caliche occurrences in Tertiary sediments in the eastern part of the basin. The exploration permits acquired by Maple contain radiometric anomalies at all three uraniferous stratigraphic levels within the Chubut Group.

Due to funding constraints and other issues, the CNEA has undertaken only limited follow-up of the radiometric anomalies in the San Jorge Gulf Basin. Only four prospects have been investigated by drilling. In the 1970s, drilling of the Los Adobes and Cerro Condor prospects in the Los Adobes Formation delineated small uranium resources which were briefly exploited in open cut operations. In 1978, the Sierra Cuadrada prospect in the Puesto Manuel Arce Formation was investigated by shallow drilling to less than 200m depth. In 1979, drilling of the Los Adobes Formation in the vicinity of the Los Adobes and Cerro Condor deposits resulted in the discovery of the Cerro Solo deposit and the subsequent delineation of a uranium resource based on 410 drill holes.

A prefeasibility study of Cerro Solo was undertaken by Nuclear Assurance Corporation International on behalf of the CNEA in 1997. The study concluded that an open cut/underground mining operation would be economically viable, based on mineable reserves at an average grade of 0.3% U3 O8, containing a recoverable uranium content of 4670 tonnes (10.3Mlbs) U3O8. In addition, the study reported that the deposit contains an average grade of 0.3% molybdenum.

In 1999 the CNEA solicited bids for the deposit in an international tender, but in March 2001 it was announced that none of the proposals received were acceptable. Two of Maple’s exploration permits, located adjacent to, and immediately east of, CNEA claims over the deposit, contain untested radiometric anomalies on the eastwards projection of the trend of the host rocks to the Cerro Solo mineralization, and offer potential for the discovery of economic uranium mineralization in both the Cerro Barcino and Los Adobes Formations.

Access to the project area is obtained by sealed road from the coastal town and provincial capital of Rawson (population 30000) located 330km to the east. The exploration permits are very favourably located for exploration activities as they are situated in easily accessible, flat-lying, sparsely vegetated ground at low elevation (~600m asl.). Climatic conditions permit exploration work throughout the year apart from the winter months of June and July when there can be heavy snow falls. The only population centre of any significance in the area is the village of Paso de Indios (population ~ 2000).

Maple will now proceed to a detailed review of previous exploration data on the radiometric anomalies with a view to prioritising targets that can be advanced to the drilling stage.

Maple has retained Argentinian geologists with considerable uranium exploration experience to manage its ground acquisition programme. Other Maple applications for Exploration Permits over uranium targets are being processed by the relevant authorities in the Province of Cordoba.

“We are very happy to have had the opportunity to acquire the Patagonia property”, stated Gino Falzone, Maple’s President. “The Patagonia acquisition is yet another step in Maple’s endeavour to become a significant worldwide uranium player.”

Stewart Taylor, Maple’s Vice President, International Operations, is acting as the Qualified Person for the Patagonia Uranium Project. Maple Minerals Corp. is a Toronto based resource company with property interests in Australia, Argentina, Africa and Canada. For more information about Maple, please visit the company’s website at www.mapleminerals.com.

This news release contains forward-looking statements within the meaning of the “safe harbour” provisions of the Private Securities Litigation Reform Act of 1995. These forward-looking statements are subject to risks and uncertainties and other factors that may cause Maple’s results to differ materially from expectations. These include risks relating to market fluctuations, property performance and other risks. These forward-looking statements speak only as of the date hereof. Maple disclaims any intent or obligation to update these forward-looking statements and cautions investors from placing undue reliance on forward-looking statements. Maple does have an ongoing obligation to disclose material information as it becomes available.

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.

Contact:

L.M. (Gino) Falzone
President
(416) 643-7630